Skip to main navigation Skip to search Skip to main content

“Hebben de gezondheidsfactoren en risico’s, binnen IT-Projectportfoliomanagement enige relatie?”

  • T. Süslü

    Student thesis: Master's Thesis

    Abstract

    The use of IT-project portfolio management (IT PPM) in organizations is increasing. Research into the relationship between risk criteria and health assessment criteria has not been conducted to date. Based on existing literature and interview reports, possible links have been identified. In the group meeting this list was determined after joint consensus. Based on this, validation took place with findings from practice, which revealed that there may indeed be a relationship between risk criteria and health assessment criteria. The results offer companies the opportunity to take a critical look at this and to optimize their portfolio management.
    Date of Award14 Jan 2022
    Original languageDutch
    SupervisorRob Kusters (Examiner) & Harry Martin (Co-assessor)

    Keywords

    • IT-project portfolio management (IT-PPM)
    • Risicocriteria
    • Gezondheidsbeoordelingscriteria

    Master's Degree

    • Master Business Process management & IT (BPMIT)

    Cite this

    '